South Lamar Boulevard Corridor

Transportation and mobility improvements are coming to South Lamar Boulevard between Riverside Drive and US 290 West as part of the Corridor Construction Program, funded in part by the 2016 Mobility Bond

What is proposed for construction

In Spring 2018, the Austin City Council approved a Corridor Construction Program that includes mobility, safety, and connectivity improvements on South Lamar Boulevard to accommodate multiple modes of transportation, including driving, walking, biking, and taking transit. 
These projects are expected to:
  • reduce vehicular delay and crashes
  • improve the effectiveness of transit
  • create continuous ADA-compliant sidewalks along the entire length of the corridor
  • create continuous bicycle facilities along the entire length of the corridor. 
More information about improvements for South Lamar Boulevard can be accessed by clicking on the following links:
Get more information about the Corridor Construction Program at AustinTexas.gov/CorridorMobility.

South Lamar Boulevard Corridor Mobility Plan

Corridor Mobility Plans were used as the basis for development of the Corridor Construction Program. The City of Austin finalized a Corridor Mobility Plan in April 2016 for South Lamar Boulevard from Riverside Drive to US 290 West.
The plan recommends short and long-term improvements that focus on ways to improve safety and accessibility along the corridor, while also improving mobility for everyone — people who drive, walk, bike, and take transit.
Click on the links below to read the plan.

Map of South Lamar Boulevard corridor. The limits are Riverside Drive to Hwy. 71

Stakeholder Engagement

The following engagement was conducted over the course of the Corridor Mobility Plan development process: 
  • Public meeting to introduce the planning process on December 10, 2014 (more than 130 participants)
  • Online survey available through December 2014 (nearly 900 responses)
  • Public meeting to review recommended improvements in May 2015 (more than 100 participants)
  • Stakeholder meetings with transportation and public agencies, major landowners, transportation advocates and interest groups
Click here to learn about outreach conducted since the plan was completed, during development of the Corridor Construction Program.

Meeting Materials Archive

Draft Recommendations Maps - Aug. 7, 2015 (click here for printable versions of the map)
December 10, 2014 Open House
The first public open house meeting was held on December 10, 2014 in the Zilker Elementary School cafeteria, located at 1900 Bluebonnet Lane. Community members were invited to learn about the goals and objectives of the study, review existing corridor data and to participate in surveys about the corridor.

May 27, 2015 Open House
The maps presented during the May 27, 2015 open house have been updated to reflect community input (see above map dated Aug. 7, 2015). The original maps are provided below for historical purposes and so that community members may see what adjustments were made based on input and further analysis.

Twitter is @atxcorridors
Facebook is Facebook.com/ATXtransportation
Instagram is @austintexasgov
Home         Contact Us         Get Notifications          Project Explorer