The City of Austin is evaluating Davis Lane as part of the 2016 Mobility Bond (Project ID 11900.006). This preliminary engineering project will evaluate road conditions for possible future design and construction opportunities for two segments of Davis Lane, Brodie Lane to West Gate Boulevard and Leo Street to Manchaca Road.

Project Limits


Project Background

The City of Austin is evaluating Davis Lane as a part of the Local Mobility Program of the 2016 Mobility Bond. This project will evaluate road conditions, missing sidewalks, curbs, and drainage elements to enhance mobility and safety for all road users.
Approved by voters in November 2016, the Mobility Bond dedicates $11 million for preliminary engineering on nine substandard streets, including Davis Lane. Substandard streets are publicly owned roadways within the City of Austin’s jurisdiction that do not meet current City of Austin requirements because they have pavement widths that are less than 24 feet and typically lack some curb and gutter, drainage, bicycle accommodations, and sidewalk infrastructure. Funding to design and construct improvements on the substandard streets has not been identified. 

Project Process

This project includes a review of existing conditions, such as traffic counts, crash data, and pinch points, as well as a review of constraints, such as right-of-way and utilities, and coordination with the City’s adopted transportation plans and policies. Community engagement will be coordinated throughout the project to share information and collect feedback.
A Preliminary Engineering Report will be developed to address substandard elements of the street, such as missing sidewalks, curbs and drainage elements. Currently, there are no construction funds allocated for Davis Lane improvements, but having a Preliminary Engineering Report allows the City to move forward quickly if funding is identified.
Davis Lane Project Schedule
Public Meeting 1: February 13, 2018
The Davis Lane project team hosted the first public meeting on February 13, 2018 to get community feedback on Davis Lane’s needs and existing conditions. 

Public Meeting 2: September 26, 2018
The Davis Lane project team hosted the second public meeting on September 26, 2018. The purpose of this meeting was to share recommendations for improvements to Davis Lane and get feedback.

Get Involved! 

The City of Austin wants to hear from residents and business owners who live, work, play and use Davis Lane. This feedback will order to inform the development of recommended improvements.  
Contact Us
  • Submit questions and comments about this project
  • Request a presentation from the Davis Lane project team for your group or organization 
Stay Updated
Provide your email below to stay up-to-date on Davis Lane.