Brodie Lane

The City of Austin is developing a Preliminary Engineering Report for Brodie Lane between Slaughter Lane and FM 1626. The goal of the Preliminary Engineering Report is to make recommendations to enhance mobility, connectivity, and safety for all users—including people who drive, walk, bike, and take transit.

Development of the plan has been underway since spring 2017 and is expected to conclude by the end of the year. The 2016 Mobility Bond does not dedicate funding to design and construction of mobility recommendations in the Brodie Lane Preliminary Engineering Report. Implementation of the recommendations would need to come from future funding sources.

Preliminary Mobility Recommendations

The preliminary recommendations to improve mobility, safety, and connectivity on Brodie Lane may be viewed by clicking here or on the image below. See frequently asked questions about the recommendations.
We are now refining the recommendations based on the feedback and additional analysis for the completed Brodie Lane Preliminary Engineering Report, which is anticipated be finalized by the end of 2017. Click here to sign up for updates about the process.

How the recommendations are developed

Many factors are being considered to develop the recommendations for mobility improvements in the Brodie Lane Preliminary Engineering Report. What is available now are preliminary recommendations. Feedback provided will be considered as the report is completed.

Public Input

The public has provided input and feedback at two separate points during the development of the Preliminary Engineering Report. In spring 2017, the community provided input on what improvements they'd like to see on Brodie Lane. Click here to view the draft results of the input received on Brodie Lane in spring 2017.
In fall 2017, the public provided feedback on preliminary recommendations to improve mobility, safety, and connectivity along the roadway.

Existing Conditions

What's happening on Brodie Lane now? Learn more about the traffic volumes and crashes that take place on Brodie Lane as well as view images of the roadway. Oprima aquí para la información en español.

Project timeline

The development of the Preliminary Engineering Report for Brodie Lane launched in spring 2017 and will conclude by the end of 2017. Oprima aquí para la información en español.

Slaughter Lane

Click on the link above to learn more about development of the Slaughter Lane Corridor Mobility Plan.

William Cannon Drive

Click on the link above to learn more about development of the William Cannon Drive Corridor Mobility Plan.