Austin Transportation and Austin Public Works are preparing to install new bikeway connections on:
  • Barton Hills Drive between High Chaparral Cove and Barton Skyway 
  • Barton Skyway between Barton Hills Drive and Menchaca Road
  • Lightsey Road between Menchaca Road and Cody Court
El Departamento de Transporte de Austin está por instalar nuevas conexiones de ciclovías en Barton Skyway, Barton Hills Drive, y Lightsey Road de High Chaparral Cove hasta Cody Court.  Favor de contactar Sophia Benner para preguntas, comentarios, o una traducción de materiales de proyectos en línea al (512) 974-7853 o sophia.benner@austintexas.gov.

Project design

Improvements include:
  • A new two-way protected bikeway on the north side of Barton Hills Drive between High Chaparral Cove and Barton Skyway
  • A new protected intersection at Barton Skyway and Barton Hills Drive 
  • New one-way protected bikeways on Barton Skyway between Barton Hills Drive and Menchaca Road
  • New one-way protected bikeways on Lightsey Road between Menchaca Road and Cody Court
Additionally:
  • No Parking in Bike Lane signs will be installed along the new protected bikeways
  • 20+ new parking spaces will be installed on the east sides of Barton Skyway and Lightsey Road between Westhill Drive and Cody Court
  • The existing parking spaces on the south side of High Chaparral Cove will remain
  • The turn lanes at the intersections of Barton Skyway & South Lamar Boulevard and Barton Skyway & Menchaca Road will remain.
illustration of the project limits with five segments color-coded
illustration of an aerial view of a protected intersection design
Barton Skyway and Barton Hills Drive intersection
The intersection at Barton Skyway and Barton Hills Drive will be reconstructed to include curb extensions, ADA-accessible curb ramps, and bikeway connections. The existing two-way protected bikeway on the north side of Barton Hills Drive between Azie Morton Road and Barton Skyway will transition to new one-way protected bikeways on Barton Skyway at this new protected intersection.

Construction schedule

Project installation is anticipated to begin late this summer and will take place in phases. The protected intersection at Barton Skyway and Barton Hills Drive will be constructed one corner at a time and could take up to four months to complete. All work is dependent on weather and any other unanticipated delays.

Have comments or questions?

Send an email to project designer Neil Quarlesor call (512) 974-7657.  